There shall be a system agreed upon with the inspector for correction of nonconformities. A nonconformity is any condition which does not comply with the applicable provisions of this Part. Nonconformities must be corrected or eliminated in some way before the completed component can be considered to comply.
Ill. Admin. Code tit. 41, § 2120.1335