Ill. Admin. Code tit. 41 § 160.170

Current through Register Vol. 49, No. 2, January 10, 2025
Section 160.170 - Piping - Tests

After installation, piping shall be tested at a pressure fifty per cent in excess of the working pressure for thirty minutes and must be proven leak proof.

Ill. Admin. Code tit. 41, § 160.170

Amended at 9 Ill. Reg. 10012, effective October 1, 1985