Current through Register Vol. 48, No. 45, November 8, 2024
Section 840.142 - Post-Closure Report and Certification of Completion of Post-Closure Care PlanPost-closure care must continue until a demonstration of compliance with the groundwater quality standards set forth in Section 840.116 has been approved by the Agency. The owner or operator of Ash Pond D must prepare and submit to the Agency for review and approval a post-closure report within 60 days after satisfying the requirements of the approved post-closure care plan and achieving the applicable groundwater quality standards as set forth in the plan and Sections 840.116 through 840.118 of this Subpart. The post-closure report must include certifications by a professional engineer that the standards and requirements set forth in this Subpart A and approved in the post-closure care plan have been met. A professional geologist may supervise post-closure care activities as appropriate under the Professional Geologist Licensing Act [225 ILCS 745 ]. The report also must contain supporting documentation, including, but not limited to:
a) Engineering and hydrogeology reports, including, but not limited to, documentation of compliance with the groundwater quality standards of this Subpart and results of the four quarterly samplings performed under Section 840.120 of this Subpart;b) Photographs of the final cover system and groundwater collection trench and any other photographs relied upon to document construction activities;c) A written summary of post-closure care requirements and activities as set forth in the post-closure care plan and this Subpart A and their completion;d) Any other information relied upon by the professional engineer or professional geologist, as appropriate for the activity, in making the post-closure care certifications; ande) The signature and seal of the professional engineer and professional geologist supervising the implementation of the post-closure care plan, and the signature and seal of the professional engineer supervising preparation of the post-closure report and making the certification of completion of the post-closure care plan.Ill. Admin. Code tit. 35, § 840.142