Ill. Admin. Code tit. 35 § 742.315

Current through Register Vol. 48, No. 49, December 6, 2024
Section 742.315 - Soil Ingestion Exposure Route

The soil ingestion exposure route may be excluded from consideration if:

a) The requirements of Sections 742.300 and 742.305 are met;
b) An approved engineered barrier is in place that meets the requirements of Subpart K;
c) Safety precautions for the construction worker are taken if the Tier 1 construction worker remediation objectives are exceeded; and
d) An institutional control, in accordance with Subpart J, will be placed on the property.

Ill. Admin. Code tit. 35, § 742.315

Amended at 25 Ill. Reg. 10374, effective August 15, 2001