Ill. Admin. Code tit. 35 § 725.544

Current through Register Vol. 48, No. 25, June 21, 2024
Section 725.544 - Inspections
a) During construction or installation, liners and cover systems (e.g., membranes, sheets, or coatings) must be inspected for uniformity, damage, and imperfections (e.g., holes, cracks, thin spots, or foreign materials). Immediately after construction or installation, liners must be inspected and certified as meeting the requirements of Section 725.543 by a qualified Professional Engineer. This certification must be maintained at the facility as part of the facility operating record. After installation, liners and covers must be inspected to ensure tight seams and joints and the absence of tears, punctures, or blisters.
b) While a drip pad is in operation, it must be inspected weekly and after storms to detect evidence of any of the following:
1) Deterioration, malfunctions, or improper operation of run-on and run-off control systems;
2) The presence of leakage in and proper functioning of leak detection system.
3) Deterioration or cracking of the drip pad surface.

Ill. Admin. Code tit. 35, § 725.544

Amended at 32 Ill. Reg. 12566, effective July 14, 2008

BOARD NOTE: See Section 725.543(m) for remedial action required if deterioration or leakage is detected.