Ill. Admin. Code tit. 35 § 604.110

Current through Register Vol. 48, No. 45, November 8, 2024
Section 604.110 - Location
a) All community water supplies must select construction sites after completing an evaluation of risk from earthquakes, land subsidence, floods, fires or other disasters that could result in breakdown of any part of the system. If a site is subject to an identified risk, the community water supply must submit a complete statement describing reasons for site selection and identify construction measures that will be taken to protect the community water supply.
b) All community water supply facilities must be located outside the flood plain or must be at least two feet above the 100-year flood elevation or maximum flood of record, whichever is higher.
c) All access roads, except roads to wells, must be protected to at least the 100-year flood elevation or maximum flood of record.

Ill. Admin. Code tit. 35, § 604.110

Adopted in R18-17 at 43 Ill. Reg. 8064, effective 7/26/2019.