Current through Register Vol. 48, No. 50, December 13, 2024
Section 365.170 - Waiver of Proceduresa) Except as provided in subsection (b) or otherwise required by law, the Director may waive any of the loan procedures, either in whole or in part, by a written statement to the loan recipient, either as a special condition of the loan or otherwise, provided the Director finds that the procedure or requirement to be waived is not necessary to insure the integrity of the project, will not reduce a recipient's ability to repay the loan to the Agency, or will not, in general, weaken the financial position of the WPCLP. The waiver may be subject to such additional conditions as the Director deems necessary.b) In addition to all federal requirements, these procedures will not be waived: 1) Section 365.210 (Fixed Loan Rate);2) Section 365.240(Restructuring);3) Section 365.320 (Project Plan);4) Section 365.330 (State Environmental Review);5) Section 365.340 (Project Priority List);6) Section 365.350(a)(10) (Ability to Repay);7) Section 365.460(a)(3) (Operation and Maintenance of the Project);8) Section 365.470 (Ongoing Auditing and Monitoring of Financial Capability);9) Section 365.620(f)(3) (Wage Provisions);10) Section 365.620(f)(4) (Disadvantaged Business Enterprise Requirements);11) Section 365.620(f)(5) (Debarment and Suspension Certification);12) Section 365.630(a)(1) (Disadvantaged Business Enterprise Requirements); and13) Section 365.630(a)(4) (Debarment and Suspension Certification).Ill. Admin. Code tit. 35, § 365.170
Adopted at 41 Ill. Reg. 7983, effective 7/1/2017Amended at 43 Ill. Reg. 11141, effective 10/1/2019