Ill. Admin. Code tit. 35 § 276.601

Current through Register Vol. 48, No. 44, November 1, 2024
Section 276.601 - Steady-State Idle Test Equipment Maintenance

All operators of exhaust gas analyzers shall conduct a preventive maintenance and quality control program consisting of the following elements:

a) an HC hang-up check conducted prior to each test and after the last test of the day; HC hang-up shall not exceed 20 ppm HC prior to any test;
b) visual inspection of all equipment prior to the first test of the day;
c) performance of analyzer preventative maintenance (e.g., filter replacement, inspection and cleaning of probes, sample lines, water traps, etc.) according to manufacturer's recommended schedules and as needed; and
d) all calibration and operating procedures specified in Section 276.602.

Ill. Admin. Code tit. 35, § 276.601

Amended at 22 Ill. Reg. 18867, effective September 28, 1998