Current through Register Vol. 49, No. 2, January 10, 2025
Section 218.445 - Leaks: General RequirementsThe owner or operator of a petroleum refinery shall:
a) Develop a monitoring program plan consistent with the provisions of Section 218.446;b) Conduct a monitoring program consistent with the provisions of Section 218.447;c) Record all leaking components which have a volatile organic material concentration exceeding 10,000 ppm consistent with the provisions of Section 218.448;d) Identify each component consistent with the monitoring program plan submitted pursuant to Section 218.446;e) Repair and retest the leaking components as soon as possible within 22 days after the leak is found, but no later than June 1 for the purposes of Section 218.447(a)(1), unless the leaking components cannot be repaired until the unit is shut down for turnaround; andf) Report to the Agency consistent with the provisions of Section 218.449.Ill. Admin. Code tit. 35, § 218.445
Amended at 17 Ill. Reg. 16636, effective September 27, 1993