COMPANY ID # / NAME | UNIT DESIGNATION | UNIT DESCRIPTION | BUDGET ALLOCATION | BUDGET ALLOCATION LESS 3% NSSA |
1 | 2 | 3 | 4 | 5 |
A. E. STALEY MANUFACTURING CO
115015ABX | 85070061299 | COAL-FIRED BOILER 1 | 176 | 171 |
115015ABX | 85070061299 | COAL-FIRED BOILER 2 | 175 | 170 |
115015ABX | 73020084129 | BOILER #25 | 125 | 121 |
A. E. STALEY MANUFACTURING CO (Total Allocation) | 476 | 462 |
ARCHER DANIELS MIDLAND CO EAST PLANT
115015AAE | 85060030081 | COAL-FIRED BOILER 1 | 238 | 231 |
115015AAE | 85060030081 | COAL-FIRED BOILER 2 | 261 | 253 |
115015AAE | 85060030081 | COAL-FIRED BOILER 3 | 267 | 259 |
115015AAE | 85060030082 | COAL-FIRED BOILER 4 | 276 | 268 |
115015AAE | 85060030082 | COAL-FIRED BOILER 5 | 275 | 267 |
115015AAE | 85060030082 | COAL-FIRED BOILER 6 | 311 | 302 |
115015AAE | 85060030083 | GAS-FIRED BOILER 7 | 19 | 18 |
115015AAE | 85060030083 | GAS-FIRED BOILER 8 | 19 | 18 |
ARCHER DANIELS MIDLAND CO EAST PLANT (Total Allocation) | 1,666 | 1,616 |
CORN PRODUCTS INTERNATIONAL INC
031012ABI | 91020069160 | GAS-FIRED BOILER 6 | 55 | 53 | |
031012ABI | 73020146041 | BOILER # 1 COAL-FIRED | 210 | 204 | |
031012ABI | 73020146042 | BOILER # 2 COAL-FIRED | 210 | 203 | |
031012ABI | 73020146043 | GAS FIRED BOILER NO 4 WEST STACK BLRS | 81 | 79 | |
031012ABI | 73020147045 | BOILER # 3 COAL-FIRED | 211 | 205 | |
031012ABI | 73020147046 | GAS FIRED BOILER NO 5- EAST STACK BOILER | 81 | 79 | |
CORN PRODUCTS INTERNATIONAL INC (Total Allocation) | 848 | 823 |
GREAT LAKES NTC
097811AAC | 78080071011 | BOILER # 5 | 26 | 25 |
097811AAC | 78080071011 | BOILER # 6 | 26 | 25 |
GREAT LAKES NTC (Total Allocation) | 52 | 50 |
JEFFERSON SMURFIT CORPORATION
119010AAL | 72120426001 | BLR 7-COAL FIRED | 39 | 38 |
JEFFERSON SMURFIT CORPORATION (Total Allocation) | 39 | 38 |
MARATHAN OIL CO ILLINOIS REFINING DIV
033808AAB | 72111291055 | BOILER #3 OIL,REF GAS FIRED | 53 | 51 |
033808AAB | 72111291056 | BOILER #4 REF GAS,OIL FIRED | 53 | 52 |
MARATHAN OIL CO ILLINOIS REFINING DIV (Total Allocation) | 106 | 103 |
EXXON MOBIL
197800AAA | 72110567002 | AUX BOILER- REFINERY GAS | 101 | 98 |
197800AAA | 86010009043 | STATIONARY GAS TURBINE | 85 | 82 |
EXXON MOBIL (Total Allocation) | 186 | 180 |
WILLIAMS
179060ACR | 73020087019 | BOILER C - PULVERIZED DRY BOTTOM | 377 | 366 |
WILLIAMS (Total Allocation) | 377 | 366 |
EQUISTAR
063800AAC | 72100016013 | BOILER # 1 | 40 | 39 |
063800AAC | 72100016013 | BOILER # 2 | 40 | 39 |
063800AAC | 72100016014 | #3 GAS FIRED BOILER | 40 | 39 |
063800AAC | 72100016016 | #5 GAS FIRED BOILER | 40 | 39 |
063800AAC | 72100016017 | #6 BOILER | 40 | 38 |
EQUISTAR (Total Allocation) | 200 | 194 |
EQUISTAR
041804AAB | 72121207108 | BOILER NO 1 | 121 | 118 |
041804AAB | 72121207109 | BOILER NO 2 | 121 | 118 |
041804AAB | 72121207110 | BOILER NO 3 | 121 | 117 |
041804AAB | 72121207111 | BOILER NO 4 | 120 | 116 |
041804AAB | 72121207112 | BOILER NO 5 | 0 | 0 |
EQUISTAR (Total Allocation) | 483 | 469 |
TOSCO
119090AAA | 72110633080 | BOILER NO 15 | 40 | 38 |
119090AAA | 72110633081 | BOILER NO 16 | 40 | 39 |
119090AAA | 72110633082 | BOILER NO 17 | 80 | 78 |
TOSCO (Total Allocation) | 160 | 155 |
U S STEEL - SOUTH WORKS
031600ALZ | 82010044013 | NO. 6 BOILER, #5 POWER STATION (FUEL-NAT. GAS) | 90 | 88 |
031600ALZ | 82010044014 | NO 1 BLR NG | 90 | 87 |
U S STEEL - SOUTH WORKS (Total Allocation) | 180 | 175 |
UNIV OF ILL - ABBOTT POWER PLANT
019010ADA | 82090027006 | BOILER # 7 | 86 | 83 |
UNIV OF ILL - ABBOTT POWER PLANT (Total Allocation) | 86 | 83 |
CITGO PETROLEUM CORPORATION
197090AAI | 72110253037 | BOILER 43-B-1 | 23 | 22 |
CITGO PETROLEUM CORPORATION (Total Allocation) | 23 | 22 |
LTV STEEL COMPANY
301600AMC | [UNIT DESIGNATION] | BOILER NO 4B | * | * |
LTV STEEL COMPANY (Total Allocation) | * | * |
* Pursuant to Section 217.460(f), Column 2, Column 4 and Column 5 will be adjusted at such time as USEPA makes an allocation for LTV Steel's Boiler No. 4B.
GRAND TOTAL | 4,882 | 4,736 |
Ill. Admin. Code tit. 35, pt. 217, subpt. X, app E