40 CFR 141.563 is incorporated by reference. In accordance with 40 CFR 142.16(g)(1), the Department has authority to require the owner of a PWC to conduct a composite correction program, as defined in Section 003, for the purpose of identifying and correcting deficiencies in water treatment and distribution. Composite Correction Programs consist of a Comprehensive Performance Evaluation (CPE) and Comprehensive Technical Assistance (CTA).
01.Comprehensive Performance Evaluation (CPE). The CPE is conducted to identify factors that may be adversely impacting a plant's capability to achieve compliance. It must emphasize approaches that can be implemented without significant capital improvements. The CPE assesses plant performance-based capabilities and associated administrative and operation and management practices.02.Comprehensive Technical Assistance (CTA). The CTA consists of follow-up to the CPE results, implementation of process control priority setting techniques, and long-term involvement to systematically train staff and administrators.Idaho Admin. Code r. 58.01.08.304