Idaho Admin. Code r. 58.01.01.225

Current through September 2, 2024
Section 58.01.01.225 - PERMIT TO CONSTRUCT PROCESSING FEE

A permit to construct processing fee, calculated by the Department pursuant to the categories provided in the following table, must be paid to the Department by the person receiving the permit. The applicable processing fee category is determined by adding together the amount of increases of regulated pollutant emissions and subtracting any decreases of regulated pollutant emissions as identified in the permit to construct. The fee calculation does not include fugitive emissions.

PERMIT TO CONSTRUCT CATEGORY

FEE

General permit, no facility-specific requirements (Defined as a source category specific permit for which the Department has developed standard emission limitations, operating requirements, monitoring and recordkeeping requirements, and that require minimal engineering analysis. General permit facilities may include portable concrete batch plants, portable hot-mix asphalt plants and portable rock crushing plants.)

$500

New source or modification to existing source with increase of emissions of less than one (1) ton per year

$1,000

New source or modification to existing source with increase of emissions of one (1) to less than ten (10) tons per year

$2,500

New source or modification to existing source with increase of emissions of ten (10) to less than one hundred (100) tons per year

$5,000

Nonmajor new source or modification to existing source with increase of emissions of one hundred (100) tons per year or more

$7,500

New major facility or major modification

$10,000

Permit modifications where no engineering analysis is required

$250

Application submittals for exemption applicability determinations, typographical errors, and name and ownership changes as described in Subsections 224.01, 224.02, 224.03

$0.00

Idaho Admin. Code r. 58.01.01.225

Effective March 28, 2023