Memorials must be erected as near as practical to the milepost location where the accident occurred. The person installing the memorial is responsible for contacting a utility locating service to identify the location of any utilities in the area prior to placement of the memorial. See call-before-you-dig requirements in Sections 55-2201 through 55-2210 of Idaho Code. The applicant is required to meet on site with the Department highway maintenance supervisor assigned to the area where a memorial is to be erected to review the proposed installation. The Department highway maintenance supervisor will be responsible for final approval of the memorial location.
Idaho Admin. Code r. 39.03.60.215