Current through September 2, 2024
Section 37.03.11.043 - MITIGATION PLANS01.Submission of Mitigation Plans. A proposed mitigation plan shall be submitted to the Director in writing and contain the following information: a. The name and mailing address of the person or persons submitting the plan.b. Identification of the water rights for which benefit the mitigation plan is proposed.c. A description of the plan setting forth the water supplies proposed to be used for mitigation and any circumstances or limitations on the availability of such supplies.d. Such information as will allow the Director to evaluate the factors set forth in Rule Subsection 043.03.02.Notice and Hearing. Upon receipt of a proposed mitigation plan the Director will provide notice, hold a hearing as determined necessary, and consider the plan under the procedural provisions of Section 42-222, Idaho Code, in the same manner as applications to transfer water rights.03.Factors to Be Considered. Factors that may be considered by the Director in determining whether a proposed mitigation plan will prevent injury to senior rights include, but are not limited to, the following:a. Whether delivery, storage and use of water pursuant to the mitigation plan is in compliance with Idaho law.b. Whether the mitigation plan will provide replacement water, at the time and place required by the senior-priority water right, sufficient to offset the depletive effect of ground water withdrawal on the water available in the surface or ground water source at such time and place as necessary to satisfy the rights of diversion from the surface or ground water source. Consideration will be given to the history and seasonal availability of water for diversion so as not to require replacement water at times when the surface right historically has not received a full supply, such as during annual low-flow periods and extended drought periods.c. Whether the mitigation plan provides replacement water supplies or other appropriate compensation to the senior-priority water right when needed during a time of shortage even if the effect of pumping is spread over many years and will continue for years after pumping is curtailed. A mitigation plan may allow for multi-season accounting of ground water withdrawals and provide for replacement water to take advantage of variability in seasonal water supply. The mitigation plan must include contingency provisions to assure protection of the senior-priority right in the event the mitigation water source becomes unavailable.d. Whether the mitigation plan proposes artificial recharge of an area of common ground water supply as a means of protecting ground water pumping levels, compensating senior-priority water rights, or providing aquifer storage for exchange or other purposes related to the mitigation plan.e. Where a mitigation plan is based upon computer simulations and calculations, whether such plan uses generally accepted and appropriate engineering and hydrogeologic formulae for calculating the depletive effect of the ground water withdrawal.f. Whether the mitigation plan uses generally accepted and appropriate values for aquifer characteristics such as transmissivity, specific yield, and other relevant factors.g. Whether the mitigation plan reasonably calculates the consumptive use component of ground water diversion and use.h. The reliability of the source of replacement water over the term in which it is proposed to be used under the mitigation plan.i. Whether the mitigation plan proposes enlargement of the rate of diversion, seasonal quantity or time of diversion under any water right being proposed for use in the mitigation plan.j. Whether the mitigation plan is consistent with the conservation of water resources, the public interest or injures other water rights, or would result in the diversion and use of ground water at a rate beyond the reasonably anticipated average rate of future natural recharge.k. Whether the mitigation plan provides for monitoring and adjustment as necessary to protect senior-priority water rights from material injury.l. Whether the plan provides for mitigation of the effects of pumping of existing wells and the effects of pumping of any new wells which may be proposed to take water from the areas of common ground water supply.m. Whether the mitigation plan provides for future participation on an equitable basis by ground water pumpers who divert water under junior-priority rights but who do not initially participate in such mitigation plan.n. A mitigation plan may propose division of the area of common ground water supply into zones or segments for the purpose of consideration of local impacts, timing of depletions, and replacement supplies.o. Whether the petitioners and respondents have entered into an agreement on an acceptable mitigation plan even though such plan may not otherwise be fully in compliance with these provisions.Idaho Admin. Code r. 37.03.11.043