Idaho Admin. Code r. 37.03.07.060

Current through September 2, 2024
Section 37.03.07.060 - REMOVAL OF SAND AND GRAVEL DEPOSITS
01.Removal of Sand and Gravel. This work consists of removal of sand and gravel deposits from within a stream channel. The following conditions shall be adhered to unless other methods have been specified in detail on the application and approved by the Director.
02.Removal Below Water Surface. Sand and gravel must not be removed below the water surface existing at the time of the work. Where work involves clearing a new channel for flow, removal of material below water level will be permitted to allow this flow to occur; however, this must not be done until all other work in the new channel has been completed.
03.Buffer Zone. A buffer zone of undisturbed streambed material at least five (5) feet in width or as otherwise specified by the Director shall be maintained between the work area and the existing stream. The applicant shall exercise reasonable precautions to ensure that turbidity is kept to a minimum and does not exceed state water quality standards.
04.Movement of Equipment. Equipment may cross the existing stream in one (1) location only, but shall not push or pull material along the streambed while crossing the existing stream.
05.Disturbing Natural Appearance of Area. Work must be done in a manner that will least disturb the natural appearance of the area. Sand and gravel shall be removed in a manner that will not leave unsightly pits or other completely unnatural features at the conclusion of the project.

Idaho Admin. Code r. 37.03.07.060

Effective March 18, 2022