Idaho Admin. Code r. 20.03.09.030

Current through September 2, 2024
Section 20.03.09.030 - TERM OF EASEMENT
01.Permanent Uses. A permanent easement will be issued for uses, facilities, and structures that are normally considered permanent in nature, such as bridges, utility crossings, highway fills, and dams.
02.Term Easements. A term easement will be issued for a specific time period of ten (10) to fifty-five (55) years and will be issued for those uses, facilities, and structures not normally considered permanent in nature.
03.Federally Licensed Facilities. The term of an easement for all federally licensed hydroelectric facilities on navigable waterways will run concurrently with the term of such license issued by FERC, or its successor, authorizing the facility. Easements for hydroelectric facilities for which FERC has issued a conduit exemption will not exceed fifty-five (55) years.

Idaho Admin. Code r. 20.03.09.030

Effective March 18, 2022