Idaho Admin. Code r. 02.04.30.260

Current through September 2, 2024
Section 02.04.30.260 - SITE SUITABILITY DETERMINATION

Within thirty (30) days of receiving a request for the formation of a CAFO site advisory team that includes the required elements of Section 67-6520E(2), Idaho Code, the team will develop and submit to the county a site suitability determination that contains:

01.Risk Category. A determination of an environmental risk category: high, moderate; low; or insufficient information to make a determination;
02.Description of Factors. A description of the factors that contribute to the environmental risks;
03.Mitigation. Any possible mitigation of the environmental risks.

Idaho Admin. Code r. 02.04.30.260

Effective July 1, 2024