Current through September 2, 2024
Section 02.03.03.600 - GENERAL CHEMIGATION REQUIREMENTS01.Pesticides Labeled for Chemigation. The chemigator will use only pesticides labeled for chemigation when chemigating.02.Monitoring Chemigation. Licensed professional applicators that start the application of chemicals through chemigation equipment do not have to be present during the entire application, but must return to monitor the proper application at least once every four (4) hours for the duration of the application.03.Chemigation Equipment Standards. Equipment will be placed on the Department's list of approved chemigation equipment after the manufacturers provide to the Department verification that the equipment meets the standards in the Department's chemigation protocol. Prior to chemigating, all chemigation systems must meet the requirements outlined in the Department's chemigation protocol. Chemigation system requirements are defined by the Department's chemigation system requirements protocol and the standards established in these rules.04.Chemigating Over Waters of the State. Shall be prohibited, except for variances allowed in Section 700.Idaho Admin. Code r. 02.03.03.600
Effective July 1, 2024 (Temporary)