Idaho Admin. Code r. 02.02.07.120

Current through September 2, 2024
Section 02.02.07.120 - PERMIT FEES

The first handler or shipper shall apply through the nearest District Inspection Office for a permit to ship bulk potatoes. The permittee shall pay the potato advertising tax at combined grower-shipper rates for either fresh or processing potatoes, and inspection fees, if required, within thirty (30) days of shipment. Failure to pay either fee within the prescribed time is grounds for denial of future permits, so long as the fees remain outstanding.

Idaho Admin. Code r. 02.02.07.120

Effective March 15, 2022