Haw. Code R. § 6-83-23

Current through April, 2024
Section 6-83-23 - Verification of data and map submittals
(a) Upon receipt of subsurface facility data or maps from a facility operator new to the system, or upon receipt of such data or maps from a facility operator currently registered with the system, the center shall make any necessary changes to center data and mapping systems regarding that facility operator's subsurface installations as soon as is practicable. The center shall annually provide all operators with hard copy, or electronic maps of their territories such that operators can provide updates regarding such information.
(b) The center shall verify with the facility operator that the changes made by the center accurately reflect, to the facility operator's satisfaction, a submittal of data or maps prior to making the changes available to the users of the system.

Haw. Code R. § 6-83-23

[Eff JAN 23 2012] (Auth: HRS § 269E-5) (Imp: HRS § 269E-3)