Section 19-170-194 - Construction plans
(a) After the subdivider has received tentative approval of the preliminary map from the executive officer, and before beginning construction of improvements, the subdivider shall prepare and submit construction plans and specifications showing details of grading, road construction, drainage structures, sewers, water, and all other utilities, improvements, landscaping and planting proposed to be installed in the proposed subdivision, in conformance with the approved preliminary map. The construction plans shall be drawn on acceptable tracing medium to City standards as to size and general drafting practice. Included with the construction plans shall be a general layout map showing the location of lots and streets and the location of water lines, sewer mains, drainage system, and other utilities.
(b) The subdivider shall submit copies of the construction plans to the executive officer or other agencies as required by the executive officer, for their consideration, comments, and recommendations. Plans submitted for approval shall bear the stamp of an engineer, or other licensed professional, as appropriate, in accordance with the rules of the state department of commerce and consumer affairs.
(c) Construction plans shall be considered approved for construction purposes when the construction plans bear the approval signature of the executive officer. No construction work shall commence without the approved construction plans.

Haw. Code R. § 19-170-194

[Eff MAY 5 2013] (Auth: HRS §§ 206J-5(5), 206J-7) (Imp: HRS § 206J-7)