Current through September, 2024
Section 13-169-52 - Criteria for ruling on application(a) The commission shall act upon an application within ninety calendar days after acceptance of the application.(b) Based upon the findings of fact concerning an application for a stream channel alteration permit, the commission shall either approve in whole, approve in part, approve with modifications, or reject the application for a permit.(c) In reviewing an application for a permit, the commission shall cooperate with persons having direct interest in the channel alteration and be guided by the following general considerations: (1) Channel alterations that would adversely affect the quantity and quality of the stream water or the stream ecology should be minimized or not be allowed.(2) Where instream flow standards or interim instream flow standards have been established pursuant to subchapters 3 and 4, no permit shall be granted for any channel alteration which diminishes the quantity or quality of stream water below the minimum established to support identified instream uses, as expressed in the standards.(3) The proposed channel alteration should not interfere substantially and materially with existing instream or non-instream uses or with channel alterations previously permitted. (c) Notwithstanding subparagraph (b) above, the commission may approve a permit pursuant to subparagraph (a) above in those situations where it is clear that the best interest of the public will be served, as determined by the commission.[Eff. MAY 27, 1988] (Auth: HRS § 174C-8) (Imp: HRS §§ 174C-5, 174C-71)