Haw. Code R. § 13-168-13

Current through April, 2024
Section 13-168-13 - Well completion report

Within thirty days after the completion of any well, the well driller or pump installation contractor, as the case may be, shall file with the commission on forms provided by the commission a well completion report containing as appropriate:

(1) State well number;
(2) Date of completion;
(3) Tax map key;
(4) Well head, top of casing, and ground elevations;
(5) Method of construction;
(6) Depths, diameters, and other dimensions of drilled hole;
(7) Depths, diameters, dimensions, and types of casing and grouting;
(8) Driller's log of water levels, depths, thickness, and drilling characteristics of sub-surface formations;
(9) Pumping test record, including times, rates of pumping, drawdown of the water level, and chloride content of the pumped water;
(10) Elevation of static water level or artesian head;
(11) Water temperature;
(12) Chemical analyses of a water sample drawn from the well; and
(13) Other information as may be required by the commission.

Haw. Code R. § 13-168-13

[Eff. MAY 27 1988] (Auth: HRS § 174C-8) (Imp: HRS §§ 91-2, 174C-85)