Haw. Code R. § 12-220-35

Current through August, 2024
Section 12-220-35 - Appendix

TABLE 220-1

BOILER AND PRESSURE VESSEL INSTALLATION REPAIR or ALTERATION PERMIT FEES

July 1, 1996

Installation Permits are based on the following per object:
Power boilers .............. $ 190
Heating boilers ............. 150
Pressure vessels............. 135
Sterilizers and steam kettles
fired and electrically heated ...... 120
Review of shops and facilities for the issuance of National Board or ASME Certificates of Authorization ............ 1,060
Repair and/or Alteration Application Fee. 100

TABLE 220-2

EXAMINATION AND LICENSE FEES July 1, 1996

Boiler inspector's certificate of competency examination ......... $250
Boiler inspector's Hawaii Commission initial 50
Boiler inspector's Hawaii Commission renewal 35

TABLE 220-3

INTERNAL AND EXTERNAL INSPECTIONS FEES July 1, 1996

Power boilers
Without manholes ............... $ 80
With manholes but not over 4,000 square feet heating surface ............... 100
Over 4,000 square feet heating surface but not over 10,000 square feet heating surface ... 200
Over 10,000 square feet heating surface . . . . 250
Heating boilers
Hot water supply ............... 70
Steam and water heating without manholes . . . 80
All with manholes ............... 90
Pressure vessels - Fees are based on the product of the overall length and the maximum width or diameter of the vessel expressed in square feet Fifty square feet area or less ....... 45
For each additional 100 square feet or portion thereof ............ 45
Maximum inspection fee for any single vessel. 250
Sterilizers and steam kettles Fired and electrically heated ......... 45
Review of shops and facilities for the issuance of National Board or ASME Certificates for their renewal............... 1,060
Report and permit processing ......... 10

Haw. Code R. § 12-220-35

[Eff 7/6/98] (Auth: HRS § 397-4) (Imp: HRS § 397-4)