Current through September, 2024
Section 11-264-344 - Hazardous waste incinerator permits(a) The owner or operator of a hazardous waste incinerator may burn only wastes specified in his permit and only under operating conditions specified for those wastes under section 11-264-345, except: (1) In approved trial burns under section 11-270-62; or(2) Under exemptions created by section 11-264-340.(b) Other hazardous wastes may be burned only after operating conditions have been specified in a new permit or a permit modification as applicable. Operating requirements for new wastes may be based on either trial burn results or alternative data included with Part B of a permit application under section 11-270-19.(c) The permit for a new hazardous waste incinerator must establish appropriate conditions for each of the applicable requirements of this subchapter, including but not limited to allowable waste feeds and operating conditions necessary to meet the requirements of section 11-264-345, sufficient to comply with the following standards: (1) For the period beginning with initial introduction of hazardous waste to the incinerator and ending with initiation of the trial burn, and only for the minimum time required to establish operating conditions required in paragraph (c)(2), not to exceed a duration of 720 hours operating time for treatment of hazardous waste, the operating requirements must be those most likely to ensure compliance with the performance standards of section 11-264-343, based on the director's engineering judgment. The director may extend the duration of this period once for up to 720 additional hours when good cause for the extension is demonstrated by the applicant.(2) For the duration of the trial burn, the operating requirements must be sufficient to demonstrate compliance with the performance standards of section 11-264-343 and must be in accordance with the approved trial burn plan;(3) For the period immediately following completion of the trial burn, and only for the minimum period sufficient to allow sample analysis, data computation, and submission of the trial burn results by the applicant, and review of the trial burn results and modification of the facility permit by the director, the operating requirements must be those most likely to ensure compliance with the performance standards of section 11-264-343, based on the director's engineering judgement.(4) For the remaining duration of the permit, the operating requirements must be those demonstrated, in a trial burn or by alternative data specified in subsection 11-270-19(c), as sufficient to ensure compliance with the performance standards of section 11-264-343.Haw. Code R. § 11-264-344
[Eff 6/18/94; comp] (Auth: HRS §§ 342J-4, 342J-31, 342J-34, 342J-35) (Imp: 40 C.F.R. §264.344 )