Haw. Code R. § §§ 11-262.263

Current through November, 2024
Section 11-262.263 - Amendment of contingency plan

The contingency plan must be reviewed, and immediately amended, if necessary, whenever:

(a) Applicable regulations are revised;
(b) The plan fails in an emergency;
(c) The generator facility changes-in its design, construction, operation, maintenance, or other circumstances- in a way that materially increases the potential for fires, explosions, or releases of hazardous waste or hazardous waste constituents, or changes the response necessary in an emergency;
(d) The list of emergency coordinators changes; or
(e) The list of emergency equipment changes.

Haw. Code R. §§ 11-262.263

[Eff 7/17/2017] (Auth: HRS §§ 342J-4, 342J-31, 342J-32, 342J-35) (Imp: HRS §§ 342J-4, 342J-31, 342J-32, 342J-35)
Am and Comp 9/30/2018
Comp 6/25/2020
Comp 6/7/2021
Am and comp 1/29/2024