Haw. Code R. § 11-262-42

Current through August, 2024
Section 11-262-42 - Exception reporting
(a)
(1) A generator of greater than one-thousand kilograms of hazardous waste in a calendar month who does not receive a copy of the manifest with the handwritten signature of the owner or operator of the designated facility within thirty-five days of the date the waste was accepted by the initial transporter must contact the transporter and or the owner or operator of the designated facility to determine the status of the hazardous waste.
(2) A generator of greater than one-thousand kilograms of hazardous waste in a calendar month must submit an Exception Report to the director if he has not received a copy of the manifest with the handwritten signature of the owner or operator of the designated facility within forty-five days of the date the waste was accepted by the initial transporter. The Exception Report must include:
(i) A legible copy of the manifest for which the generator does not have confirmation of delivery;
(ii) A cover letter signed by the generator or his authorized representative explaining the efforts taken to locate the hazardous waste and the results of those efforts.
(b) A generator of greater than one-hundred kilograms but less than one-thousand kilograms of hazardous waste in a calendar month who does not receive a copy of the manifest with the handwritten signature of the owner or operator of the designated facility within sixty days of the date the waste was accepted by the initial transporter must submit a legible copy of the manifest, with some indication that the generator has not received confirmation of delivery, to the director.

Haw. Code R. § 11-262-42

[Eff 6/18/94; comp] (Auth: HRS §§ 342J-4, 342J-31, 342J-32, 342J-35) (Imp: 40 C.F.R. §262.42 )