Haw. Code R. § 10-4.1-26

Current through November, 2024
Section 10-4.1-26 - Unscheduled meter replacement

If a consumer requests a meter replacement prior to the scheduled routine replacement, the consumer will be billed for the service call plus the current cost of the meter. As is the case with all new meters, upon installation the meter becomes the property of the department.

Haw. Code R. § 10-4.1-26

[Eff 6/25/2021] (Auth: HHC Act §222) (Imp: HHC Act §221)