Current through Rules and Regulations filed through October 29, 2024
Rule 672-5-.06 - Ability or Multiplying Factor for Prospective Bidders(1) The Engineer will, as part of past performance, require the District Engineers to execute and submit a past performance report on all prime contractors performing work for the Department.(2) Where a Prospective Bidder has no record of work with the Department, past performance information will be obtained from others for whom it has performed work.(3) These reports shall be used as a basis for determining upon renewal or resubmission of an application, the Prospective Bidder's, past performance rating, which rating shall then be considered in determining the Ability or Multiplying Factor in accordance with the forms on file in the office of the Prequalification Committee.Ga. Comp. R. & Regs. R. 672-5-.06
O.C.G.A. §§ 32-2-2, 32-2-66, 50-13-4.
Original Rule entitled "Ability or Multiplying Factor" adopted F. Aug. 9, 1973; eff. Aug. 29, 1973.Repealed: New Rule, same title adopted. F. Oct. 23, 2000; eff. Nov. 12, 2000.Amended: New title "Ability or Multiplying Factor for Prospective Bidders." F. May 1, 2018; eff. May 21, 2018.