Rule 672-18-.03 - Prequalification Requirements

The Department has established a policy and procedure governing the qualifications of professional consultants and contractors to perform work. All contractors and consultants for Design-Build Projects must be prequalified by the Department by the date of submission of proposals in response to the RFP utilizing the One Phase Low Bid selection method; or by the date of submission of the SOQ utilizing the Two Phase Low Bid and Best Value selection methods.

Ga. Comp. R. & Regs. R. 672-18-.03

O.C.G.A. Secs. 32-2-2, 32-2-81, 50-13-4.

Original Rule entitled "Prequalification Requirements" adopted. F. Sept. 22, 2006; eff. Oct. 12, 2006.
Amended: F. Sep. 26, 2013; eff. Oct. 16, 2013.