Current through Rules and Regulations filed through October 17, 2024
(1) An NMP must include at least the following maps, in color:(a) An aerial map of the site delineating areas where soil amendments will be applied, which includes:1. The total acreage of the site and the total acreage of the area to which a soil amendment will be applied; and2. The GPS coordinates or latitude and longitude of the centroid of proposed application fields.(b) A topographic map or maps identifying:1. Boundaries of all areas where soil amendments will be applied, including buffer areas;3. Areas of the site located in a 100-year floodplain;4. Location of all dwellings on or adjacent to the application site;5. Location of all public wells on-site or within five hundred feet of the site;6. Location of all private wells on-site and within two hundred and fifty feet of the site;7. Surface waters, such as ponds, lakes, rivers, or streams, on or adjacent to the application site; and8. Natural or manmade drainage areas, including intermittent streams and ditches, on or adjacent to the application site.(2) Each NMP map must include:(b) The date the map was prepared;(c) A legend with map symbols if the map includes symbols; and(d) A bar scale on the map.Ga. Comp. R. & Regs. R. 40-31-3-.03
O.C.G.A. § 2-12-80.
Original Rule entitled "Maps" adopted. F. Dec. 7, 2022; eff. Dec. 27, 2022.