Ga. Comp. R. & Regs. 391-3-21-.11

Current through Rules and Regulations filed through October 29, 2024
Rule 391-3-21-.11 - American Recovery and Reinvestment Act (ARRA) Georgia Truck Stop Electrification and Green Corridors
(1) The American Recovery and Reinvestment Act (ARRA) Georgia Truck Stop Electrification (TSE) and Green Corridors Grant Program Scope and Purpose. Grants are available through ARRA to create green corridors in Georgia by installing TSE along the major interstates.
(a) General Terms and Conditions of the Grant.
1. The grant funding must be exclusively used to install TSE as an alternative to operating an internal combustion engine for cab comfort for trucks or other vehicles and/or reefer units on trailers. Projects submitted for funding under this grant must identify the locations and parking spaces that will be electrified and the type of technology and equipment to be used. Eligible TSE costs include the purchase and installation of necessary equipment to electrify truck parking spaces, associated hardware and software, and necessary infrastructure. Existing or acquired land for the parking spaces, TSE equipment and hardware, or infrastructure are not eligible expenses and cannot be used as an in-kind match.
2. The TSE equipment must be located in Georgia with preference given to locations outside of areas designated as nonattainment for fine particulate mater (PM2.5).
3. Projects that are awarded these funds will require a minimum 20% match. The project applicant will be responsible for the match. Grant funds will be distributed to grantee incrementally following completion of construction task(s) provided the match has been satisfied for the incremental distribution.
4. Grant recipients must conform to all applicable administrative and programmatic conditions.
5. Selected projects must be completed by September 30, 2010.
(b) Eligible Recipients of the Grant. An eligible grant recipient is any TSE vendor seeking grant funding to provide electrification technology for heavy-duty trucks that idle for extended periods of time at truck stops in Georgia.
(c) Criteria for the Award. This project is limited to applications that will be used to assist in the development of "green corridors" in the southeast. EPD intends to fund the purchase and installation of TSE equipment at a minimum of three truck stop locations along Georgia interstate(s). The amount of funding per application will depend on the amount of funds requested by applicants and availability of grant funds. The highest scoring project will be fully funded, subject to a maximum of 40% of the total available funding. The second and third highest scoring projects will be funded at equal percentage based on funding requested, and subject to a maximum of 40% each of the total available funding. If the first three projects are fully funded, then the remaining funds will be awarded sequentially to the next highest score. A scoring system will be used to rank and select the submitted applications. The application(s) receiving the highest total score(s) will be selected. The maximum score for a project will be 100. The following criteria will be used to score the submitted applications:
1. Maximized distance between existing TSE locations from the proposed location in application - 35 Maximum Criteria Points;
2. Proposed locations are along interstate corridors with a minimized distance between the proposed TSE location and the interstate entrance/exit ramp - 20 Maximum Criteria Points;
3. Experience of vendor installing TSE - 10 Maximum Criteria Points;
4. Exceeds minimum matching fund requirement of 20% - 10 Maximum Criteria Points; and
5. Minimize grant costs per parking space for selected TSE design - 25 Maximum Criteria Points.
(d) Deadline For Submittal. EPD will send out the first solicitation for applications on or before October 1, 2009. Applications will be due by close of business on November 2, 2009. If any funds are remaining after projects are selected from the solicitation issued on or before October 1, 2009, additional solicitations will be issued with specific deadlines until all funds have been exhausted. All applications submitted in response to any additional solicitations will be evaluated based on the criteria in part (c). Selected applicants must sign the memorandum of agreement with EPD within 30 days of receipt of the MOA from EPD.
(2) Directions For Submitting Applications for the ARRA Georgia TSE and Green Corridors Grant. Requests for copies of the general guidelines and proposal forms and submittal of applications for the ARRA Georgia TSE and Green Corridors Grant should be made to:

Georgia Environmental Protection Division

Mobile and Area Sources Program

Attn: Richard McDonald

4244 International Parkway, Suite 136

Atlanta, Georgia 30354

e-mail: Richard_McDonald@dnr.state.ga.us

(3) Award of ARRA Georgia TSE and Green Corridors grants are subject to Federal funding provided to EPD.

Ga. Comp. R. & Regs. R. 391-3-21-.11

O.C.G.A. Sec. 12-9-6.

Original grant description entitled "American Recovery and Reinvestment Act (ARRA) Georgia Truck Stop Electrification and Green Corridors Grant Program" submitted October 20, 2009.