Plans and specifications approved by the Commissioner shall be accompanied by an approval letter issued by the Commissioner, and a stamp of approval shall be placed on each plan print and on the table of contents sheet of each manual. An approved copy of the plans and specifications shall be returned to the manufacturer with an approval letter indicating any necessary limitations. A copy of the approved documents shall be available for inspection at each place of manufacture.
Ga. Comp. R. & Regs. R. 110-2-8-.12
O.C.G.A. Sec. 8-2-113.