If the manufacturer plans to produce at more than one location, building system plan approval may be obtained at the time of filing subject to submission of an additional set of plans, specifications and quality control procedures for each manufacturing site. If, subsequent to building system approval, the manufacturer wishes to obtain approval for additional locations of manufacture, application shall be made to the commissioner prior to start of production at such locations.
Ga. Comp. R. & Regs. R. 110-2-7-.05
O.C.G.A. Sec. 8-2-113.