Following receipt of inspection approval and the inspection report, the manufacturer shall make application for an insignia for each re-manufactured industrialized building as required by these Rules. The application shall be submitted to the commissioner accompanied by the appropriate insignia fees as required by the fee schedule in these rules.
Ga. Comp. R. & Regs. R. 110-2-11-.07
O.C.G.A. Sec. 8-2-113.