The building shall be inspected by an approved inspection agency for compliance with the approved plans. The building shall be inspected at a designated remanufacturing site or at a location approved by the commissioner, other than the proposed site of installation. All portions of the building, including concealed spaces, shall be made available for inspection, as requested by the inspection agency. The inspection agency may require inspections to be made during the re-manufacturing process or may require that portions be opened or made accessible.
Ga. Comp. R. & Regs. R. 110-2-11-.03
O.C.G.A. Sec. 8-2-113.