In the event that any industrialized building bearing the state insignia is found to be in violation of the approved plans, the inspection agency or Commissioner shall remove the insignia on such defective unit and shall furnish the manufacturer, agency, dealer, and installer with a written statement of such violation. The manufacturer shall be required to correct the deficiencies and shall request an inspection to bring the industrialized building into compliance before the Commissioner shall issue a replacement insignia. Refer to Rule 110-2-13-.07 Field Technical Service for charges for inspection.
Ga. Comp. R. & Regs. R. 110-2-10-.10
O.C.G.A. Sec. 8-2-113.