Following the receipt of building system and model design plan approval, the manufacturer shall make application for an insignia as required herein. The application shall be submitted to the Commissioner accompanied by the appropriate insignia fees as required by the fee schedule in these rules. The application shall include the building system approval number of each unit for which an insignia is required.
Ga. Comp. R. & Regs. R. 110-2-10-.04
O.C.G.A. Sec. 8-2-113.