Fla. Admin. Code R. 40E-41.121

Current through Reg. 50, No. 129; July 2, 2024
Section 40E-41.121 - Definitions

When used in this Part:

(1) "Pre-project" means the hydrologic conditions which existed prior to the construction of the canal known as C-38.
(2) "Floodplain" means that area depicted on Figure 41-3, Plates 1 through 5, (August 2016) [http://www.flrules.org/Gateway/reference.asp?No=Ref-07151], incorporated by reference herein, and available at no cost by contacting the South Florida Water Management District Clerk's Office, 3301 Gun Club Road, West Palm Beach, FL 33406, (800)432-2045, ext. 2729 or (561)682-2729.

Fla. Admin. Code Ann. R. 40E-41.121

Rulemaking Authority 373.044, 373.113, 373.4131 FS. Law Implemented 373.413, 373.4131, 373.416 FS.

New 5-1-85, Amended 12-1-11, Amended by Florida Register Volume 42, Number 144, July 26, 2016 effective 8/7/2016.

New 5-1-85, Amended 12-1-11, 8-7-16.