D.C. Mun. Regs. r. 27-4007

Current through Register Vol. 71, No. 24, June 14, 2024
Rule 27-4007 - CONTRACT QUALITY ASSURANCE AT SOURCE
4007.1

The District shall perform contract quality assurance, including inspection, at the source in the following circumstances:

(a) Performance at any other place would require uneconomical disassembly or destructive testing;
(b) Considerable loss would result from the manufacture and shipment of unacceptable goods, or from the delay in making necessary corrections;
(c) Specially required instruments, gauges, or facilities are available only at the source;
(d) Performance at any other place would destroy or require the replacement of costly special packing and packaging;
(e) District inspection during contract performance is essential; or
(f) The contracting officer determines that source inspection is in the best interests of the District.

D.C. Mun. Regs. r. 27-4007

Final Rulemaking published at 35 DCR 1719 (February 26, 1988)