The licensee of a newly constructed, remodeled or renovated tanning facility shall ensure that the design, construction, building materials, and workmanship complies with the District's Construction Codes of 2008, as specified in Section 102.1(a) of this chapter.
The licensee of an existing tanning facility shall maintain in good condition the physical integrity of its tanning facility by repairing or replacing structural or design defects, operating systems, or fixtures in use before the effective date of these regulations in accordance with the District's Construction Codes of 2008, as specified in Section 102.1.
At least thirty (30) days before beginning construction or remodeling of a tanning facility, the licensee shall submit construction plans with all schedules, including but not limited to floor plans, elevations, and electrical schematics, to the Department for review and approval, as specified in Section 806.
D.C. Mun. Regs. tit. 25, r. 25-F600