D.C. Mun. Regs. r. 21-1805

Current through Register Vol. 71, No. 24, June 14, 2024
Rule 21-1805 - FEE SCHEDULE
1805.1

Fees shall be paid in full at the time an application for well construction or well registration is made, as specified in Table 1. Table 1: Well Fee Schedule ITEM FEE Well Permit Review and Registration Origination a. Closed-Loop Ground Source Heat Pump Well $15.00 per well or $150.00 per lot b. Temporary Construction Dewatering Well and Ground Freeze Well $5.00 per well or $125.00 per lot c. Monitoring Well, Observation Well, Piezometer/Soil Boring, Injection Well, and Recovery Well $10.00 per well or $100.00 per lot d. Water Supply Well $75.00 per well Well Registration Renewal a. Biennial well(s) registration renewal $25.00 per lot b. Five-Year Closed-Loop Ground Source Heat Pump Well(s) registration renewal $25.00 per lot Changes to Well Registration a. Change-in-Ownership $25.00 per lot b. Change-in-Well-Use $25.00 per lot

Table 1: Well Fee Schedule

ITEMFEE
Well Permit Review and Registration Origination
a. Closed-Loop Ground Source Heat Pump Well $15.00 per well or
$150.00 per lot
b. Temporary Construction Dewatering Well and Ground Freeze Well$5.00 per well or
$125.00 per lot
c. Monitoring Well, Observation Well, Piezometer/Soil Boring, Injection Well, and Recovery Well$10.00 per well or
$100.00 per lot
d. Water Supply Well$75.00 per well
Well Registration Renewal
a. Biennial well(s) registration renewal$25.00 per lot
b. Five-Year Closed-Loop Ground Source Heat Pump Well(s) registration renewal $25.00 per lot
Changes to Well Registration
a. Change-in-Ownership$25.00 per lot
b. Change-in-Well-Use $25.00 per lot

1805.2

The Department may adjust the fees for inflation once every calendar year beginning on January 1, 2017, using the Urban Consumer Price Index published by the United States Bureau of Labor Statistics.

D.C. Mun. Regs. r. 21-1805

Final Rulemaking published at 63 DCR 13424 (10/28/2016)