D.C. Mun. Regs. tit. 15, r. 15-905

Current through Register 71, No. 45, November 7, 2024
Rule 15-905 - STANDARD CONTRACT
905.1

The Electric Company shall develop a standard contract that implements these rules, which shall be subject to the review and approval of the Commission. Such standard contract shall be consistent with the provisions of this chapter, as well as with the Energy Policy Act of 2005 and the Commission's Interconnection Rules under Chapter 40 of Title 15 of the DCMR.[1]

[1] Energy Policy Act of 2005, Pub.L. 109-58, 119 Stat. 594 (2005); F.C. 1050, 56 D.C. Reg. 001415-001487 (February 13, 2009) to be codified as 15 D.C.M.R. Chapter 40, District of Columbia Small Generator Interconnection Rules ("DCSGIR").

D.C. Mun. Regs. tit. 15, r. 15-905

Final Rulemaking published at 52 DCR 1588 (February 18, 2005); as amended by 55 DCR 7302 (July 4, 2008); as amended by Final Rulemaking published at 57 DCR 5249, 5252 (June 18, 2010)
Authority: D.C. Code § 2-505(a) (2001 Ed.) and D.C. Code § 34-1518 (2001 Ed.).