D.C. Mun. Regs. tit. 12, 12-IB103.7

Current through Register Vol. 71, No. 39, September 27, 2024
Section 12-IB103.7 - Electrical service reserved space

The main electrical service panel shall have a reserved space to allow installation of a dual pole circuit breaker for future solar electric installation and shall be labeled "For Future Solar Electric." The reserved space shall be positioned at the opposite (load) end from the input feeder location or main circuit location.

D.C. Mun. Regs. tit. 12, 12-IB103.7

Final Rulemaking published at 67 DCR 5679 (5/29/2020)