D.C. Mun. Regs. tit. 12, r. 12-M101

Current through Register Vol. 72, No. 2, January 10, 2025
Rule 12-M101 - BUILDING PERMIT FEES
101.1

The Director shall charge the following fees, pursuant to the Construction Codes Approval and Amendments Act of 1986, effective March 21, 1987 (D.C. Law 6-126; D.C. Official Code § 6-1405.01 ):

(a) Building structures and equipment:

Description

Fee Description

Fee Amount

New construction and alterations

Filing deposit

50% of the assessed permit fee based on the estimated cost of construction not to exceed $20,000.

New construction and additions

Permit fee

$0.03 per cubic foot of construction

Green Building Fee - New construction

$0.002 per square foot of construction

Alteration and

repair

Permit Fee: construction valued less than $500

$33

Permit Fee: construction valued between $501-$1,000

$65

Permit Fee: construction valued between $1,001-$1 million

$30 + 2% of construction value $1001-$1 million

Permit Fee: construction valued over $1 million

$10,030 + 1% of total construction cost

Green Building Fee: construction valued between $1,001-$1 million

0.13% of construction value

Green Building Fee: construction valued over $1 million

$1,300 + 0.065% of construction value over $1 million

Asbestos removal

Same as alteration/repair

Awning

$65 each

Capacity placard review

$20/hour

Contamination testing

$33

Demolition

$30 + 2% of construction cost

Excavation only

Less than 50,000 cubic feet

$130

50,000 cubic feet or more

$650

Fire retardant painting

Less than 200 square feet

$26

200 square feet or more

$46

Fence on private property (installation or repair)

$33

Foundation only

Less than 50,000 cubic feet

$130

50,000 cubic feet or more

$650

Garage (new) or shed (new)

$65

Grandstand

100 or fewer seats

$33

101-500 seats

$65

501-1,000 seats

$100

Each additional 1,000 seats

$33

Projection into public space

Residential

$65 each

Commercial

$130 each

Modification (variance)

$130 each

Raze

$0.02/cubic foot

Retaining wall, tank, tower

$46/$1000 of construction cost

Sheeting & shoring

Less than 50,000 cubic feet

$130

50,000 cubic feet or more

$650

Sign

New up to 25 square feet

$65

New between 25-100 square feet

$130

More than 100 sq. ft.

$130 + $2 for each square foot over 100 square feet

Billboard repair

$33 each

Special Sign artwork change

$500 each

Swimming Pool

Up to 15,000 gallons

$260

More than 15,000 gallons

$260 + $33/1000 gallon

Test boring for gas/soil/water

$7/bore

Miscellaneous (antenna, kiosk, pole, satellite dish, temporary barricade/fence/trailer/sidewalk shed/bridge, tent, tower crane)

$33 each

Permit renewal or change of permit ownership

$33 each

Postcard Permit

$33 each

(b) Special permits and reviews:

Description

Fee Amount

Commission for Fine Arts review filing (first time, non-refundable)

$33

Covenant

Processing

$325

Requiring Mayor's signature

$130 additional

Preliminary Design Review Meeting

Single family

$65

Commercial: less than 10,000 sq. ft. (1 hour maximum)

$130

Commercial: between 10,000-100,000 sq. ft. (2 hour maximum)

$390

Commercial: 100,001 square feet and greater (3 hour maximum)

$650

Additional: per full or fraction of hour

$150

Repeat Technical Review (rejected, revised, re-reviewed plans)

Single family

$65

Commercial: less than 10,000 square feet

$130/discipline

Commercial: between 10,000-100,000 square feet

$390/discipline

Commercial: 100,001 square feet and greater

$650/discipline

Tenant layout

$20/hour

Home Occupation

Non-refundable permit filing fee

$33

Permit issuance fee

$33

Certificate of Occupancy

Copy

$7 for regular copy; $20 for certified copy/affidavit

5,000 square feet or less

$42 + $33 filing fee

5,001-50,000 square feet

$42 + $0.004/square foot + $33 filing fee

50,001-100,000 square feet

$276 + $0.003/square foot + $33 filing fee

100,001 sq. ft. or more

$471 + $0.0013/square foot. + $33 filing fee

Certificate of Use

Enclosed sidewalk café

$260 + $0.03/cubic foot

Unenclosed

$260

Certificate of use

$260 per year

Accelerated Permit Review

Projects 50,000 square feet or less.

$50,000 per day

Projects 50,001-99,999 square feet

$50,000 + $0.50 per each square foot more than 50,000 per day

Projects 100,000 square feet or more

$75,000 per day

Accelerated Stage Plan Review

Projects 10,000 square feet or less

$5,000 per meeting for 4 meetings

Projects 10,001 square feet and more

$10,000 per meeting for 4 meetings

(c) Supplemental permits:

Description

Fee

Annual inspection certification-BBPV

$33 each

Boiler furnace change or rebuilding

$52 each

Boiler - MB

$46 each

Fired object (misc.)

$46 each

Incinerator & trash chutes

0-100 lbs/hour or domestic incinerator

$33 each

101-300 lbs/hour

$52

301-500 lbs/hour

$65

Over 500 lbs/hour

$100

H/W boiler

0-500 gals/hour

$46 each

Over 500 gals/hour

$52 each

Incinerator

alterations

0-300 lbs

$33 each

Over 300 lbs

$52 each

Heating boiler

0-1200 MBH

$33 each

1201-6000 MBH

$52 each

Over 6000 MBH

$65 each

0-8,500 sq. ft.

$52 each

Over 8,500 sq. ft.

$100 each

Miniature boiler

Up to 500 gallons/hour

$46 each

500 gallons/hour and over

$52 each

Oil-fired furnace

0-100 MBH

$26 each

Over 100 MBH

$33 each

Power boiler

Q-10 HP; or 1675-8369 MBH

$52 each

11-50 HP; or 8370-16,739 MBH

$65 each

51-150 HP

$100 each

Over 150 HP; over 33,479 MBH

$195 each

0-1674 MBH

$33 each

16,740-33,479 MBH

$111 each

Trash chute: No incinerator installation or misc.

$46 each

Unfired pressure vessel

$33 each

(d) Additional supplemental permits:

Group 1. Outlet (receptacle, switch, or fixture) wiring only

Outlets(receptacles, switches, fixtures)

$20 for each 10, or fraction of 10

Group 2. Fixture & Lamp Holder

Lights fixtures and lamp holders

$8 for each 10, or fraction of 10

Group 3. Electrical Discharge Sign

Up to 500 VA

$26

Each additional whole or fraction of 500 VA

$20

Group 4. Heating Equipment

Baseboard or space heater

$10/KW up to 10 KW; $6 for each additional KW

Furnace or unit heater

$36 for first one; $16, each additional

Furnace controls wiring/replacement only

$24 each

Group 5. Commercial Heating and Cooking

Appliance, 1-8 kW range

$26 for first one; $16, each additional

Appliance, over 8 kW range

$36 for first one; $16, each additional

Group 6. Motors & Generators

Less than 1/4 HP range

$20 for each 10 or fraction of 10

1/4-1 HP range

$33 for first motor; $16 for each additional

1-5 HP range

$46 for first motor; $16 for each additional

Over 5-10 HP range

$60 for first motor; $20 for each additional

Over 10-20 HP range

$72 for first motor; $26 for each additional

Over 20-30 HP range

$91 for first motor; $39 for each additional

Over 30-50 HP range

$117 for first motor; $47 for each additional

Over 50-75 HP range

$130 for first motor; $52 for each additional

Over 75 HP range

$143 for first motor; $65 for each additional

Group 7. Service

Service conductor - conductors and poles

$26 for first service/pole; $8 each additional service/pole

Service conductor - overhead/underground

$20 each

Group 8. Service & Meter Equipment

Up to 20 Amp range

$39 for first; $16 for each additional

201-400 Amp range

$52 for first; $24 for each additional

401-800 Amp range

$78 for first; $39 for each additional

Over 800 Amp range

$124 for first; $52 for each additional

Group 9. Transformers

1-10 kVA range

$33 for first; $16 for each additional

11-75 kVA range

$46 for first; $20 for each additional

76-200 kVA range

$55 for first; $23 for each additional

Over 200 kVA range (vault)

$117 for first; $52 for each additional

Group 10. Theater or Other Places of Public Assembly Equipment

Spotlight

$33 for first arc; $16 each additional

$26 for first portable/temporary arc; $16 each additional

$20 for first portable/incandescent; $8 each additional

Motion picture machine

$65 for first permanent; $33 for each additional

$39 for first portable; $20 for each additional

Slide projector

$36 for first; $20 each additional

Amplifier or portable switchboard

$33 for first; $16 each additional

Switchboard or dimmer over 1kW

$26 for first; $16 each additional

Portable TV installation

$26 for first receiver; $13 each additional

Portable or temporary incandescent light (no spotlights)

$26 for 1-25 lights; $33 for 26-50 lights; $39 for 51-100 lights

$13 for each additional 100 lights or fraction of 100

Group 11. Temporary Installations, Decorations, Lawn Fetes, etc

1-25 lights

$33 for the first 90 days; $16 for each additional 90 days or more

26-50 lights

$39 for the first 90 days; $20 for each additional 90 days or more

51-100 lights

$55 for the first 90 days; $28 for each additional 90 days or more

Each additional 100 lights

$20 for the first 90 days; $8 for each additional 90 days or more

Use of current on wiring, apparatus, and fixtures, for use pending installation completion

$55 for the first 90 days; $28 for each additional 90 days

Circus/carnival

$125 for up to 50 kW; $125 for each additional 100 kW

Exhibition

$60 for up to 3000 square feet; $33 for each additional 1000 square feet

Group 12. Radio and Television

Centralized receiver amplifier

$33 for the first amplifier; $25 for each additional

Centralized speaker station

$20 for the first station; $20 for each 10 or fraction of 10

Closed circuit television camera

$26 for the first camera; $20 for each additional

Receiving station (including antenna/ground connection device for receivers)

$20 for the first station; $15 for each additional

Transmitting station

$65 for the first station; $33 for each additional

Group 13. Miscellaneous (R=Residential)

ARC vapor lamp

$26 for the first; $16 for each additional

Battery charger

$33 for the first; $16 for each additional

Crane, electric, for construction work

$125

Central air conditioning system, up to 5 T (R)

$65 for the first; $26 each for 2-25 systems; and $16 each for more than 25

Clothes dryer (R) or range (R)

$20 for the first; $7 for each additional

Conduits-empty

$20 per floor

Electric furnace (R)

$39 for the first; $29 each for 2-25 systems; and $16 each for more than 25

Electric sign-incandescent

$8 for each 10 or fraction of 10

Fire alarm system devices

$20 for each 10 or fraction of 10

Panel board replacement/feeder conductor replacement

$20 for the first panel board/feeder; $8 for each additional

Preventive maintenance

$130 per switchboard

Rectifier or welder

$39 for the first; $16 for each additional

X-ray machine

$33 for the first; $16 for each additional

Postcard Permit: Electrical General

$20 each

Postcard Permit: Electrical Heavy-Up

$59 each

Fire alarm/smoke/heat detectors; or LV telephone/data/voice outlets; or LV security alarm devices/data/voice devices; or sprinkler flow/tamper switches

$20 each 10 or fraction of 10

Minimum permit fee

$20

Appliances installation each type

$26 for the first; $20 for each additional

Gas conversion burner installation

$46 each

Postcard Permit

$26 per fixture or appliance

Gas appliances include boilers, cookers, ranges, furnaces, heaters, ironers (commercial or residential), kettles, mangles, radiators, refrigerators, stills, water heaters, grills, fireplaces, dryers, ovens, broilers, and fryers.

Refrigeration Air Conditioning

Class E - 0-120,000 BTU/ h

Class D - 120,000-600,000 BTU/h

Class C - 600,001-1,200,000 BTU/h

Class B - 1,200,001-2,400,000 BTU/h

Class A - over 2,400,000 BTU/h

$46 each

$78 each

$195 each

$260 each

$390 each

Postcard Permit (up to 10 Ton)

$46 each

Line cap (includes sewer, water); line cut (includes gas, sewer, soil waste, vent, and water lines); line test (gas lines); or meter relocation (gas or water)

$26 each

Plumbing fixture

$26 for the first; $20 for each additional

Postcard Permit

$26 per fixture or appliance

Sprinkler system (alter, install, repair, & check valve)

NFPA 13 system, up to 50 heads

Each additional head over 50

NFPA 13R or 13D system, up to 20 heads

$4 per head

$2 per head

$3 per head

Plumbing fixtures including backflow preventers, basins, bath tubs, bidets, dishwashers, down spouts, drains (area/floor/roof), drinking fountains, garbage disposals, grease interceptors, hose bibs, laundry tubs, sewage ejectors, showers, sinks, slop sinks, sump pumps, urinals, washer boxes, and water closets.

Boundary Surveys

Field work

$93

Drafting

$25

Computing

$38

Wall Examination

Wall examination

$182 + $117/hour

Surveys: all types except wall exams (minimum of 2 hours charged)

$255 + $117/hour

Wall compilation

$60 per building

Building Plats

Up to 3 usual-shaped lots

$50

More than 3 usual-shaped lots

$50

Each additional lot

$15

Unusual-shaped lots/large size tracts

$30/hour

Optional expedited building plat

$75

Optional electronic building plat

$5

Certified copies of records

$20

Optional Preliminary Review Meetings

With Surveyor

$50/hour

With Surveyor's office staff

$30/hour

Computation Plat

Research, computation, preparation, and recording of plat up to 3 usual-shaped sites

$200

More than 3 usual-shaped sites

$200

Each additional site

$60

Correction of plat or plans

$100

Registration of Land Surveyors

Application

$125

Examination

$72

Retake of examination

$40

Renewal of certification

$75

Late renewal of certification

$100

Reinstatement of certification

$137

Street and Alley Closings or Revisions

Closing application initial processing stage

$2,500

Final processing stage

$1,170

Application Revision

Prior to completion of agency review application

$130 each

After initial agency review

$130

Dedication only of street and alley

$72

Changing application basis after legislative package prepared

$72 each

Changing application basis after recordation

$101 each

Public Hearing and Recording

Public hearing and recording

$1,170 each

Change of Highway Plan

Research, computation, and preparation

$1,870

Public hearing and recording

$1,170

Transfer of jurisdiction plat

$420

Subdivision of Land Plats for:

Up to 3 usual-shaped lots

$400

More than 3 usual-shaped lots

$400

Each additional lot

$60

Irregular shaped sites (minimum fee for usual-shaped lot)

$60/hour

Recordation

$26

Redrawing plat of subdivision

$65

Correcting/amending plat prior to recordation

$24

Analysis of deed description

$8

Preparing written metes and bounds description

$65

Correcting/amending plat prior to recordation

$24

Property Line Analysis Statement

Issuance of written statement

$104

Site visit (no written statement)

$65

Establishment or Abandonment of Easements

Miscellaneous plat

$232

Field work

$95/hour

Drafting

$25/hour

Computing

$38/hour

Recordation of Private Surveyors Plats

Recording

$100

Filing wall examination report

$50

Condo Plats

Initial recording of plats and plans

$390

Plus

$20 per recorded sheet

Recording amended plan and/pr plan

$195

Plus

$20 per amended sheet

Cancellation of private surveyor's recorded condo plat

$100

Survey Copy Fees

Prints from document or from microfilm normal service

$4

Plat obtained from archival storage

$39

Plus print

$4

Unusually large prints

$8

Fire Suppression Systems: Hoods and Ducts

1-50 nozzles

$6 each

Each nozzle thereafter

$3 each

Minimum project review fee

$33

Shop Drawing Review

Shop drawing review fees

$20/hour

Elevator

Elevator repair fee

1% of construction cost

New elevator fee

$85

Designation of a New Address

New address

$25 each

Modification and Variance Requests

Modification and variance requests

$175

D.C. Mun. Regs. tit. 12, r. 12-M101

Final Rulemaking published at 61 DCR 2782 (March 28, 2014 Part 2); amended by Final Rulemaking published at 65 DCR 5813 (5/25/2018); amended by Final Rulemaking published at 65 DCR 9207 (9/7/2018)
Authority: Section 10 of the Construction Codes Approval and Amendments Act of 1986 (Act), effective March 21, 1987 (D.C. Law 6-216; D.C. Official Code § 6-1409 (2012 Repl.)) and Mayor"s Order 2009-22, dated February 25, 2009, as amended; additionally, Paragraph 7 of the General Expenses titles of An Act Making appropriations to provide for the expenses of the government of the District of Columbia for the fiscal year ending June thirtieth, nineteen hundred and ten, and for other purposes, approved March 3, 1909 (35 Stat. 689, Ch. 250; D.C. Official Code § 6-661.01(a) (2008 Repl.)) and Mayor"s Order 2013-23, dated January 29, 2013.