If the Commission schedules a public hearing on an application or petition for an amendment to the Zoning Map, prior to advertisement of the hearing, the applicant or petitioner shall pay a hearing fee in accordance with the following schedule:
An applicant or petitioner shall not be required to pay a hearing fee for any alternative districts added by the Commission at the time it sets the case for hearing.
If the Commission schedules a public hearing on a petition for an amendment to the text of the Zoning Regulations, prior to the advertisement of the hearing, the each section of this title proposed to be added, deleted, or amended, with a maximum hearing fee of one thousand three hundred dollars ($1,300).
If the Commission schedules a public hearing on an application for approval of a PUD or air space development, prior to the advertisement of the hearing, the applicant shall pay a hearing fee in accordance with the following schedule:
In the case of an application or petition combining two (2) or more actions described in this section, the fee charged shall be the greatest of all the fees computed separately.
If the Commission schedules a public hearing on an application for a modification to an approved PUD or air space development, prior to the advertisement of the hearing, the applicant shall pay a hearing fee equal to twenty-six percent (26%) of the original hearing fee or one thousand three hundred dollars ($1,300), whichever is greater.
An application for a modification to an approved required or voluntary design review shall pay the same hearing fee as stated in Subtitle Z § 1601.6 at the time the application is filed.
TABLE Z § 1601 - SCHEDULE OF HEARING FEES
MAP AMENDMENT | |||
Case Type | Unit | Fee | Maximum |
R-1 through R-3, R-6 through R-17, or R-19 through R-21 zone | 43,560 sq. ft. or part of that area | $ 650 | $65,000 |
RF-1 through RF-3 zone and RA-1 or RA-6 | 43,560 sq. ft. or part of that area | $1,625 | $65,000 |
RA-2, RA-7, RA-8, or RC-1 | 43,560 sq. ft. or part of that area | $3,250 | $65,000 |
RA-3 through RA-5, RA-9, RA-10, D-1-R, SEFC-2, SEFC-3, or CG-1 zone | 43,560 sq. ft. or part of that area | $6,500 | $65,000 |
MU-1, MU-2, MU-10 through MU-14, D-2, SEFC-1, SEFC-4, CG4 through CG-7, and ARTS-4 zones | 10,000 sq. ft. or part of that area | $2,600 | |
MU-3 through MU-6, NMU-3 through NMU-6, D-4-R, CG-2, ARTS-1, and ARTS-2 zones | 10,000 sq. ft. or part of that area | $1,625 | |
NHR, MU-7 through MU-9, MU-20, MU-21, MU 28, MU-30, NC-6, NC-8, NC-12, NC-13, NC-15, D-3 through D-5, D-5-R, D-6, D-6-R, D-7, D-8, CG-3, and ARTS-3 zone | 10,000 sq. ft. or part of that area | $3,250 | |
Any PDR zone | 20,000 sq. ft. or part of that area | $2,600 | |
TEXT AMENDMENT | |||
Case Type | Unit | Fee | Maximum |
Each section of this title proposed to be added, deleted, or amended | Per section modified | $ 325 | $ 1,300 |
PLANNED UNIT DEVELOPMENT OR AIR SPACE DEVELOPMENT | |||
Case Type | Unit | Fee | Maximum |
For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to dwelling units, and the immediate area needed to serve that dwelling unit | 100 sq. ft. of gross floor area or part of that area | $ 7 | $65,000 |
For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to any use other than a dwelling unit and the immediate area needed to serve that dwelling unit | 100 sq. ft. of gross floor area or part of that area | $ 13 | |
MODIFICATION TO A PLANNED UNIT DEVELOPMENT OR AIR SPACE DEVELOPMENT | |||
Case Type | Unit | Fee | Maximum |
Modification to an approved design review, PUD, air space development, or any other action where review of a specific site or building plan was required | 26% of the original hearing fee or $1,300, whichever is greater |
D.C. Mun. Regs. tit. 11, r. 11-Z1601