When a zone has a front build-to requirement, the front fa?e of all buildings and structures must directly abut the build-to line.
D.C. Mun. Regs. tit. 11, r. 11-B316
When a zone has a front build-to requirement, the front fa?e of all buildings and structures must directly abut the build-to line.
D.C. Mun. Regs. tit. 11, r. 11-B316