Current through Register Vol. 28, No. 4, October 1, 2024
Section 7301-8.0 - Well Completion Reports8.1 General Requirements 8.1.1 A well completion report and formation log shall be submitted to the Department in a format provided by the Department, not later than 30 days after the construction of any well, except as required in subsection 3.13 .3.8.1.2 Each completion report shall be signed by the well driller or well driver in direct on-site supervision of the well construction.8.1.3 Failure to submit well completion reports as required by this Section shall result in the denial of additional well permits.8.1.4 The completion report shall include the results of all testing required in the permit.8.1.5 If geophysical logs were generated, the completion report shall include two copies of each log.8.1.6 An illegible or incomplete completion report will be returned to the preparer.8.1.7 If the well location is different from that proposed on the application, the new location shall be drawn and noted on the completion report.8.1.8 For wells in unconsolidated sand and gravel aquifers, the well formation log shall include notation of the sediment type, grain size, color, texture, accessory materials, thickness, and depth of individual layers or lenses, and other distinctive features.8.1.9 For wells in crystalline rock, the well formation log shall include the rock type (such as schist, gneiss, marble), color, hardness, texture, veining, and all other distinctive features, including depth interval, and estimation of flow rate of all water-bearing zones as encountered during drilling.8.1.10 For non-vertical wells, the angle and direction of drilling shall be noted on the completion report, and a site plan showing the top and bottom of the well included in the report.7 Del. Admin. Code § 7301-8.0
20 DE Reg. 180 (9/1/2016)<linebreak/> 20 DE Reg. 374 (11/1/2016) (Final)