As discussed in Section 204, the Department Land Treatment System (LTS) Permit incorporates a Plan of Operation and Management submitted by the owner or owner's engineer. This plan covers operation of both the spray fields and preapplication treatment facility. It provides a management scheme consistent with the basis of design outlined in the Design Development Report. Once accepted by the Department, the Plan of Operation and Management becomes the operating and monitoring guidebook for the slow rate land treatment system. A suggested outline for the scope of the Plan of Operation and Management is presented in the following Subsection 90.0.
7 Del. Admin. Code § 7103-79.0