7 Del. Admin. Code § 1351-H-1.0

Current through Register Vol. 28, No. 7, January 1, 2025
Section 1351-H-1.0 - General Requirements
1.1 Owners and Operators shall comply with the requirements of Part H for UST systems with Field-Constructed Tanks as follows:
1.1.1 For UST systems installed on or before January 11, 2020, the requirements are effective according to the following schedule:

RequirementEffective Date
Upgrading UST Systems; general operating requirements; and Operator trainingNo later than October 13, 2021
Release DetectionNo later than October 13, 2021
Closure; financial responsibility and notification (except as provided in Part H, subsection 1.1.2.1)In effect after January 11, 2020
Release reporting, response, and investigationIn effect

1.1.2 For UST systems installed after January 11, 2020, the requirements shall apply at the time of installation
1.1.2.1 After January 11, 2020, all Owners of previously deferred UST systems shall submit a one-time notice of UST system existence to the Department, in accordance with Part A, Section 4.0. Owners and Operators of UST systems in use as of January 11, 2020 shall demonstrate financial responsibility in accordance with Part F of these Regulations at the time of submission of the notification form.
1.1.2.2 Except as provided in Part H, Section 2.0, Owners and Operators shall comply with all applicable requirements of Parts A, B, C, D, E, F and G of these Regulations.
1.1.2.3 In addition to the industry referenced standards listed in Part A, Section 3.0, Owners and Operators may use military construction criteria, including Unified Facilities Criteria (UFC) 3-460-01, Petroleum Fuel Facilities, when designing, constructing, and installing Airport Hydrant Fuel Systems and UST systems with Field-Constructed Tanks.

7 Del. Admin. Code § 1351-H-1.0

23 DE Reg. 581 (1/1/2020) (Final)
27 DE Reg. 533 (1/1/2024) (Final)